RSS Feed Source: Academic Keys

Lecturer Pool (part time) – Department of Bioengineering – College of Engineering

Position overview

Position title: Lecturer
Salary range: The UC academic salary scales set the minimum pay at appointment. See the following table for the current salary scale for this position: https://www.ucop.edu/academic-personnel-programs/_files/2025-26/represented-july-2025-scales/t15.pdf. The current full-time salary range for this position is $75,301 – $199,722. Starting salary will be commensurate with highest degree, past college-level teaching experience, relevant industry experience and equity within the department.

Percent time: 11%-33% Instructors teaching one course with three hours of lecture per week will normally be appointed at 33% time during the semester; exact percentages depend on contact hours and other assigned duties.

Anticipated start: Fall semester (only) 8/1/25-12/31/25
Spring semester (only) 1/1/26 – 5/31/26
Academic-year appointments 7/1/25 – 6/30/26

Review timeline: The review of applications for fall semester will be be in May, and in October for spring semester.

Click this link to continue reading the article on the source website.

RSS Feed Source: Academic Keys

Mission Operations Engineer (7115U), Space Sciences Laboratory – 78646

About Berkeley

At the University of California, Berkeley, we are dedicated to fostering a community where everyone feels welcome and can thrive. Our culture of openness, freedom and belonging make it a special place for students, faculty and staff.

As a world-leading institution, Berkeley is known for its academic and research excellence, public mission, diverse student body, and commitment to equity and social justice. Since our founding in 1868, we have driven innovation, creating global intellectual, economic and social value.

We are looking for applicants who reflect California’s diversity and want to be part of an inclusive, equity-focused community that views education as a matter of social justice. Please consider whether your values align with our Guiding Values and Principles, Principles of Community, and Strategic Plan.

At UC Berkeley, we believe that learning is a fundamental part of working,

Click this link to continue reading the article on the source website.

RSS Feed Source: Academic Keys

In-brief analysis

June 11, 2025

Developers plan to add 18.7 gigawatts (GW) of combined-cycle capacity to the grid by 2028, with 4.3 GW already under construction, according to our latest Preliminary Monthly Electric Generator Inventory. Although electricity generators fueled by natural gas have provided more electricity in the United States than any other source since 2016, hardly any new natural gas capacity came online last year.

Combined-cycle units contribute to grid operation, reliability
Relatively efficient combined-cycle gas turbines (CCGTs) account for most of the natural gas-fired generating capacity in the United States. CCGT units are flexible and can quickly ramp up or down to respond to changes in power supply, supporting the reliability of the transmission system especially as more renewable capacity is integrated in the system.

The design lifetime of CCGT units is typically 25 years

Click this link to continue reading the article on the source website.