RSS feed source: Volcano Discovery.com

Volcanoes Today, 9 Jun 2025: Santiaguito volcano, Fuego, Semeru, Shiveluch, Ibu, Dukono, Reventador, Sangay

Mon, 9 Jun 2025, 18:00 1749492004 | BY: VN

Satellite image of Shiveluch volcano on 9 Jun 2025

Shiveluch (Kamchatka): Explosive activity continues. Volcanic Ash Advisory Center (VAAC) Tokyo warned about a volcanic ash plume that rose up to estimated 13000 ft (4000 m) altitude or flight level 130 and is moving at 20 kts in SE direction.
The full report is as follows: POSS ERUPTION OBS AT 20250609/1030Z FL130 EXTD SE OBS VA DTG:09/1100Z to 13000 ft (4000 m)

Ibu (Halmahera, Indonesia): Explosive activity continues. Volcanic Ash Advisory Center (VAAC) Darwin warned about a volcanic ash plume that rose up to estimated 7000 ft (2100 m) altitude or flight level 070 .
The full report is as follows: VA TO FL070 REPORTED AT 09/1440Z MOV SE EST VA DTG:09/1540Z to 7000 ft (2100 m)

Semeru (East

Click this link to continue reading the article on the source website.

RSS feed source: Volcano Discovery.com

INITIAL PUBLIC NOTICE
SAN JOAQUIN COUNTYWIDE BACKUP GENERATORS AND PUMPS
SAN JOAQUIN COUNTY, CALIFORNIA

LPDM-PJ-09-CA-2024-001

The U.S. Department of Homeland Security’s Federal Emergency Management Agency (FEMA) intends to provide federal financial assistance under the Legislative Pre-Disaster Mitigation Program to San Joaquin County in San Joaquin County, California, to improve water and storm drainage system reliability and resiliency against power outages during storm and flood events. The proposed action would mitigate impacts from flood hazards by installing five emergency backup generators and upgrading one pump at existing pump stations. Pursuant to Executive Order 11988 (Floodplain Management) and FEMA’s implementing regulations at Title 44 of the Code of Federal Regulations Part 9, FEMA hereby provides interested parties with a notice of its intent to carry out an action affecting a floodplain.

The purpose of the proposed action is to reduce flood hazards. The proposed action would occur at five pump station locations and consists of installing a new gas generator and upgrading the existing pump at one location, replacing an existing generator with a new gas generator at another location, and installing new gas generators at three other locations. The generators would be installed with new gas connections, automatic transfer switches, and electrical connections with new electrical service. The proposed generators would be placed on concrete pads. Services would feed from the public right-of-way to each site with new gas meters installed

Click this link to continue reading the article on the source website.