Link to the full source article

RSS feed source: US Energy Information Administration

In-brief analysis

September 3, 2024

Data source: U.S. Energy Information Administration, Liquefaction Capacity File, and trade press
Note: Export capacity shown is project’s baseload capacity. Online dates of LNG export projects under construction are estimates based on trade press. LNG=liquefied natural gas; FLNG=floating liquefied natural gas

North America’s liquefied natural gas (LNG) export capacity is on track to more than double between 2024 and 2028, from 11.4 billion cubic feet per day (Bcf/d) in 2023 to 24.4 Bcf/d in 2028, if projects currently under construction begin operations as planned. During this time, we expect developers in Mexico and Canada to place their first LNG export terminals into service and in the United States to add to existing LNG capacity. By the end of 2028, we estimate LNG export capacity will grow by 0.8 Bcf/d in Mexico, 2.5

Click this link to continue reading the article on the source website.