RSS feed source: Federal Emergency Management Agency

Revisions Aimed at Helping to Clarify Claims Process

SANTA FE, N.M. – The FEMA Hermit’s Peak/Calf Canyon Claims Office has updated its Program and Policy Guide (PPG) to Version 2.0, a comprehensive document outlining the claims process and policy and procedural requirements for the people impacted by the Hermit’s Peak/Calf Canyon Fire. The PPG version 2.0 supersedes version 1.1. 

The new version of the PPG is aligned with the Hermit’s Peak/Calf Canyon Fire Assistance Act (“Act”) passed by Congress. It incorporates additional information on risk reduction, diminution in value (DIV), the National Flood Insurance Program (NFIP), acequia costs, cascading impacts, and detailed guidance for appeals, and arbitration, reopening claims and requests for information (RFI). “The updated PPG 2.0 compiles all policies implemented by the Claims Office into a single document and reflects our commitment to addressing the unique needs of impacted communities and maximizing the fair and accurate compensation to claimants,” said Jay Mitchell, Director of Operations at the New Mexico Joint Recovery Office.

For questions, contact our Claims Office helpline at 505-995-7133. Helpline staff are available from 7:30 a.m. to 5 p.m., Monday through Thursday. You can also leave a voicemail outside of regular operating hours. The Claims Office is committed to meeting the needs of people impacted by the fire and subsequent flooding as outlined in the Fire Assistance Act. As of August 5,

Click this link to continue reading the article on the source website.

RSS feed source: Federal Emergency Management Agency

Contract: Full Time/Fixed Term for three (3) years.

Supervisor:

Dr Mohamed Lamine Faycal BELLAREDJ, Assistant Professor
Department of electrical engineering, Universite de Moncton (Moncton campus)
Email: [[email protected]]

Context & Motivation:

Because of their extreme computational needs where workloads demand rapid and significant shifts in power consumption, next-generation high-performance computing (HPC) platforms used in machine learning, big data and artificial intelligence (AI) based applications (CPUs, GPUs, AI accelerators etc.) require high power demands with optimized power distribution networks (PDNs) to improve power efficiency and preserve power integrity. Integrated voltage regulators (IVRs) with integrated passives can play a key role as a part of the PDN in enhancing power efficiency and performance in HPC systems. IVRs either in package or on-chip, provide voltage regulation closer to the load, enabling miniaturization and modularity while reducing resistive losses due to shorter PDN interconnects, and enabling faster power management loops with

Click this link to continue reading the article on the source website.

RSS feed source: Federal Emergency Management Agency

Randolph-Macon College invites applications for a tenure-track position in Civil Engineering to begin in Fall 2026. RMC’s ABET-accredited Engineering program is part of the Department of Physics, Engineering, and Astrophysics and includes a rigorous series of foundation and elective courses focused largely on Engineering Mechanics as well as hands-on, project-based design, and analysis courses where students learn to apply the essential technical principles to a series of complex, real-world problems. 

Major/Essential Functions: Randolph-Macon College faculty teach, advise, conduct research and engage in scholarship with undergraduate students, and serve the College and program.

Institution Information: Randolph-Macon College is a nationally-recognized residential institution of about 1800 students located in Ashland, Virginia, just north of Richmond. Founded in 1830, the college offers a broad range of academic programs, including a graduate program in PA studies. The RMC curriculum, grounded in a liberal arts core, and our culture of personal attention foster intellectual growth and personal

Click this link to continue reading the article on the source website.