RSS feed source: International Atomic Energy Association--Nuclear & Radiological Events

External contamination of a worker beyond the annual statutory limit to the skin

Print View Posted on: 05 August 2025

Event Date: 09 June 2025 Event Type: Power Reactor Event Location: France, CATTENOM-3 INES Rating: 2 (Final)

On 12 June 2025, the operator of the Cattenom nuclear power plant reported a significant radiation protection event concerning the exceeding of an annual individual dose limit by an EDF contractor.
On 9 June 2025, this contractor was installing lead matting in reactor building 3, which was shut down for partial inspection. During the check carried out at the exit of the controlled area, skin contamination was detected on the contractor’s cheek. The worker was immediately taken into care and the radioactive particle causing the contamination was removed.
The occupational physician assessed the dose received, taking into account the worker’s activities within the reactor building. This assessment showed that the dose received by the worker’s cheek exceeded the regulatory limit for the equivalent skin dose (500 mSv).
As soon as the contamination was discovered, the operator took action to identify its source. However, radiological checks carried out in the premises where the agent was present

Click this link to continue reading the article on the source website.

RSS feed source: International Atomic Energy Association--Nuclear & Radiological Events

Support us – Help us upgrade our services! We truly love working to bring you the latest volcano and earthquake data from around the world. Maintaining our website and our free apps does require, however, considerable time and resources.
We need financing to increase hard- and software capacity as well as support our editor team. We’re aiming to achieve uninterrupted service wherever an earthquake or volcano eruption unfolds, and your donations can make it happen! Every donation will be highly appreciated. If you find the information useful and would like to support our team in integrating further features, write great content, and in upgrading our soft- and hardware, please make a donation (PayPal).

Planned features:

Improved multilanguage supportTsunami alertsFaster responsivenessThanks to your past donations, these features have been added recently:Design upgradeDetailed quake statsAdditional seismic data sourcesDownload and Upgrade the Volcanoes & Earthquakes app to get one of the fastest seismic and volcano alerts online:
Android | IOSThank you!

Click this link to continue reading the article on the source website.

RSS feed source: International Atomic Energy Association--Nuclear & Radiological Events

External contamination of a worker beyond the annual statutory limit to the skin

Print View Posted on: 05 August 2025

Event Date: 24 July 2025 Event Type: Power Reactor Event Location: France, GRAVELINES-1 INES Rating: 2

On 25 July 2025, the operator of the Gravelines nuclear power plant reported a significant radiation protection event concerning the exceeding of an annual individual dose limit by an EDF contractor.
Reactor 1 at the Gravelines nuclear power plant was in shut down for maintenance and refuelling. During the night of 23 to 24 July, as part of radiographic testing of a pipe located in the reactor building, a worker was contaminated on the head. This contamination was detected at the exit of the reactor building during a radiological check.
The worker was taken care of by the changing room attendant in order to remove the radioactive particles, and then by the site’s medical service.
The occupational physician carried out a conservative assessment of the dose received, taking into account the worker’s activities within the reactor building. This assessment showed that the dose received by the worker’s neck exceeded the regulatory limit for equivalent skin dose (500

Click this link to continue reading the article on the source website.